ASBESTOS
SURVEY & REMOVAL
All asbestos removal projects are managed within industry legislation, approved codes of practice and HSE guidance notes. Rigorous audits ensure all quality control procedures are maintained by both internal and external independent companies.


OUR METHOD
Prior to any soft stripping or structural demolition works a refurbishment and demolition survey must be undertaken. Samples of materials are taken from various locations within the buildings to determine the quantity and type of asbestos materials present

OUR RESPONSIBILITY
Each contract is undertaken with the same professionalism whether it is large, small, short term or long term. Every contract undertaken by our experienced asbestos removal operatives overseen by competent supervisors and management, all of whom hold the relevant asbestos training as required by the Licensed Contractors Guide (Asbestos).